Various Hope VI Shower Upgrades - Federal Funding ReBid

Solicitation #: 
5892
Category: 
Construction and maintenance
Issue Date: 
Friday, December 1, 2023
Due Date: 
Thursday, December 21, 2023 - 2:00pm
Status: 
Open
Solicitation Document
Solicitation Type: 
Request for Bids
Description: 
  1. The Contractor will be required to furnish and install, through self-performance or the management of Subcontractors one or more of, but not limited to the following elements of work: 
  1. Demo, as needed.
  2. Main installation types:
      1. Installation of a custom sized acrylic one-piece shower pan over the existing shower pan.
      2. Installation of a custom formed one-piece acrylic shower wall system over the existing shower walls.
        1. New tempered glass shower doors
      3. Installation of a custom sized acrylic one-piece Tub and or tub surround over the existing tub / surround; or install new tub.
  3. Installation of accessories:
  1. Stainless steel grab bars:
        1. A minimum of one grab bar to be installed in each unit, but more could be needed on a case-by-case basis. 
  2. Soap dish: To tie-in to existing floor drain and caulking. 
  3. Shower valves: Typically, shower valves will not need to be replaced.
  1. If this is required, then SHA will review a submittal for the extra work of installation by the contractor. If approved, a Change Order will be issued to cover the additional cost of work.
  1. Conversions:
  1. Conversion from tub to shower.
  2. Conversion of existing tub/shower to an ADA roll-in shower.
  1. Repairs as needed but not limited to:
  1. Wall repair for rot/mold in walls/flooring.
  1. Finishing as needed but not limited to:
  1. Exposed edges capped with extruded molding.
Pre-bid meeting: 
Thursday, December 14, 2023, at 11:00 AM, on Microsoft Teams. Meeting link provided at end of Request for Bids form.
12.14.2023 11:00am
Deadline to submit questions: 
Friday, December 15, 2023 - 5:00pm